WRIA 14
TECHNICAL COMMITTEE MEETING
Wednesday, May 12, 2004
10:00 a.m. – 12:00
p.m.
Shelton Civic Center
Shelton, WA
DRAFT MEETING SUMMARY
Attending:
Diane Marcus-Jones, Bob Fink &
Stephanie Kenny, Mason County; Jeanne Kinney, Thurston County; Theresa Parsons,
City of Shelton; Phil Wiatrak, Dept. of
Ecology; John Noble, Citizen; Bob Burkle, WDFW; Diane Cooper, Taylor Shellfish;
Bob Simmons, WSU Cooperative Extension; & Susan Gulick, Sound Resolutions.
1.
Instream Flow Grant and Hydro-Geo Project
q A WDFW instream
flow expert has voiced some concerns about the grant amendment but no one knows
what they are yet. Bob Burkle and/or
Phil will try to find out and get them resolved quickly.
q The TC
reviewed and addressed Brad Caldwell’s concerns.
q The Base
grant and the instream flow grant both need to be amended simultaneously for
the project to proceed. Phil will work
directly with Bob on this.
q The TC
reviewed the NW Land & Water contract amendment and made some
revisions. Susan will communicate these
changes to the consultant.
q It is
clear that the meeting with the consultants after the preliminary phase of the
contract will be key for deciding whether to move forward and to refine the
details of the remaining tasks.
Therefore the TC believed this meeting was best for the PU as a whole
rather than for the TC.
q Phil
requested that the contract clarify that equipment purchased becomes the
property of the Planning Unit, and that Ecology needs to be consulted in
selecting equipment.
2.
Temperature
study on Goldsborough Creek
q The TC was
satisfied with the scope of work prepared by the Squaxin Tribe; the only
requested change was to have the final report provided in digital format (as
well as hard copy).
3.
Storage Grant Application
q The PU is
still waiting for the grant application to be approved but it is not
anticipated to be a problem.
q The TC
reviewed the draft contract amendment with Cosmopolitan. The TC requested that the contract state
that the project manager needs to coordinate with Susan, who will be the project
manager for the PU.
4.
RFP for Plan Writing
q The TC
reviewed a draft RFP for plan writing.
A clear plan outline would improve the RFP. Susan will send out a couple of outlines and the PU will try to
finalize the outline at the next PU meeting.
5.
Budget
q Bob F.
reviewed some updated staffing costs.
q Susan will
work with Bob to update the budget for the next PU meeting.
6.
Upcoming Meetings
q There will
be a joint meeting with WRIAs 14, 15 & 16 in the afternoon on Thursday,
June 10th. The exact time
and place willl be e-mailed later.
q The next
PU meeting will be on Wed. May 26th from 2:30-4:30 at the Shelton
Civic Center.
q The next
TC meeting will be on Wed. June 9th from 10-12 at the Shelton Civic
Center.